214.237.7022

Industrial

click on left or right side to see additional images.

THERMA-TRU MANUFACTURING FACILITY

This project consisted of a Pre-Engineered Steel Building (PEMB).  Armstrong-Douglass served as Engineer Of Record for the PEMB.

Location:                   Roland, Oklahoma
Building Size:            1 story, 375,000 sf
Architect:                   Burrough-Brasuell Corp.
Client:                        Butler Manufacturing Corp.
Services Provided:   Structural engineering of PEMB structure