214.237.7022

Current Work

CIRRUS SELF STORAGE

The scope of this project consists of an adaptive reuse of a 48,000 sf portion of a former big-box retail building into a 2-story, climate-controlled storage facility.  The mezzanine structure consists of a concrete-filled metal deck with load-bearing metal stud walls.

Location:                     Spokane, WA
Project Size:                490,000 sf
Client:                          Parkway Construction & Architecture
Services Provided:     Structural engineering, Structural evaluation of existing building